Sep 20, 2026  
2026-2027 Catalog 
    
2026-2027 Catalog
Add to Catalog (opens a new window)

DDT 2243 - Cost Estimating

3
(Prerequisites: MAT 1133  or MAT 1134  or higher) Preparation of material and labor quantity surveys from actual working drawings and specifications. (2 hr lecture, 2 hr lab)



Add to Catalog (opens a new window)