Apr 30, 2026  
2024-2025 Catalog 
    
2024-2025 Catalog [ARCHIVED CATALOG]

Add to Catalog (opens a new window)

IMM 1514 - Equipment Installation & Alignment

4
Instruction in pre-installation checks, assembly, location and layout of equipment, preparation of foundations and anchoring procedures, rigging and hoisting, and alignment and initial setup of equipment. (1 hr lecture, 6 hr lab)



Add to Catalog (opens a new window)